The regulation assigns seven (7) “EuroClass/reaction to fire” levels, ranging from ‘Aca’ to ‘Fca’  The CPR ranking highest to lowest are: Aca; B1ca; B2ca; Cca; Dca; Eca and Fca. The ‘ca’ tag     on the letter indicates cable. Classes are listed from the most stringent ‘A’,  non-combustible, to   ‘F’. For telecommunication cables, the best performance you’re likely to see is B2ca. Typically, EuroClasses are assigned based on the application space/structure type. Structures with a high density of people (public spaces) or limited evacuation routes (hospitals/high rise) may specify       a higher rated classification e.g. hospitals may be rated as B2ca or Cca; commercial properties may be Cca or Dca; while a single family dwelling may be Dca or Eca. This varies from country to country and even within country regions.

Euroclass Level Description Environments
B2ca

 

Very High fire protection (self-extinguishing)

High density of people or individuals with limited mobility (Fire exits in public building,
Airports and Hospitals)

Cca

High Fire protection
(self-extinguishing)

Medium density of people
(Public buildings, schools, hotels, and office buildings)

Dca

Moderate Fire Protection
(Limited emissions)

In some regions this is used a
minimum cable requirement.

Eca

Basic Fire Protection

In some regions this is used a
minimum cable requirement.

 

CPR is mandatory for all European countries, but the minimum CPR requirements may vary from country to country. Some countries have implemented a minimum classification and some countries have adopted a risk assessment methodology based on the type of installation or its fire suppression system.

Different classes require different criteria to be applied. Therefore, cables will be made and tested to achieve the requirements of a particular class. It is not just the way they’re made and tested, it involves who tested them and how the manufacturing process is controlled. Cable cannot simply “jump up class” by tweaking the manufacturing or doing some more tests. Class B1ca cable could be sold as Class Cca (as Class B1ca is superior to Class Cca), but Class Cca cannot be sold as.

Class B1ca.

Countries Installation Conditions CPR Requirement as of
1st July 2017
Belgium

F2:Cables in bundles and in vertical position which
do not propagate the flame in the test conditions.

Cca, S1, a1

F1: Cables simply laid and in the test conditions that do not propagate the flame and extinguish themselves within a short distance of the fire that
has ignited them

 

Eca minimum

Denmark

All areas

Eca

Finland

Local Wiring Regulations

Eca

Buildings with a high density of people

Dca

France

Underground stations and tunnels

B2ca, s1a,d1,a1

Very high rise buildings

 

Cca,s1,d1,a1

Offices with height >28m

Offices having >700 people

Data Centers and Server/Routing Rooms

All others

Dca,s2,d2,a2

Germany

All evacuation routes

 

B2ca,s1,d1,a1

Data Centers & Server Rooms

Rail / Road tunnels

Hospitals

All others

Cca,s1,d2,a1

Iceland

All evacuation routes

Cca,s1,d1,a1

All others

Dca,s2,d2

Spaces equipped with a fire alarm or an automatic
fire suppression system, a cable class of one step lower than required may be used

 

Ireland

Likely to follow UK

 

Italy

Train and Underground Stations

B2ca,s1a,d1,a1

Airports, Seaports

 

 

Cca,s1b,d1,a1

Hospitals

Hotels

Schools

Offices having >300 people

Retail, Conference centres

Government Buildings >24m

All others

Cca,s3,d1,a3

Netherlands

Hospitals >500m2

B2ca,s1,d1,a1

Tunnels >500m2

Protected evacuation routes

Cca,s1,d1,a1

Buildings with >500 people

All others

Dca,s3,d2,a3

Norway

All areas

Dca

With automatic fire suppression installed

Eca

Countries Installation Conditions CPR Requirement as of
1st July 2017
Poland (patch cords are included in
CPR)

Public Buildings

Dca,s2,d2,a1

 

Non-public buildings

 

Eca

Spain

All areas

Cca,s1b,d1,a1

Sweden

All areas

Dca

Switzerland

Government buildings escape routes

Cca,s2,d1,a2

Government buildings other areas

Dca

Non-government buildings escape routes

Dca,s2,d1,a2

Non-government buildings other areas

Eca

Turkey

Data Centers

B2ca,s1,d0,a1

Exhibition Centers

Rail/Road tunnels

 

B2ca,s1,d1,a1

Hospitals

All escape routes

Hotels, height >30.5m

High rise buildings ≥ 21.5 m

All others

Cca,s1,d2,a1

UK

BS 7671: IET wiring Regulations, 18th Edition

CPR is referred to in an
annex

 

Escape Routes

BS 6701 for data cables & Dca,s2,d2,a2 for power
cables

BS 6701: Bundled telecommunications “installation
cables”

Cca,s1,d2,a2

BS 6701: All other telecommunications cables

Eca

Note: Always check with local building control authorities and refer to national regulations.